The release of the 2026 National Defence Strategy and updated Integrated Investment Program has brought Australia’s strategic intent into sharp focus. This is not an incremental update to existing policy.…
Australia is navigating a global fuel challenge that is testing the fundamentals of how we move people and freight. The pressure is real, and the message from industry is clear:…
Australia’s rail sector is entering its most active procurement cycle in years. Major programs across multiple states are hitting critical milestones simultaneously, creating a density of opportunity that manufacturers, contractors,…
The transition from policy to procurement is well underway. What the 2024 Integrated Investment Program signalled, 2026 is now delivering. For businesses operating in or adjacent to the defence sector,…
The Australian Government has a long-term vision for a robust, resilient and internationally competitive Australian industry that is positioned to meet Defence’s requirements, generate economic growth, and support employment opportunities…
Matthew French recently returned to work after longer than planned Christmas break. Being a member of the Army Reserves, he was called to work on the bushfire crew around the…
When Yarra Trams was required to develop a Systems Engineering Management Plan that met the ISO1588 standard and Competency Guidelines, it called upon Systematiq’s consulting expertise to ensure compliance. Yarra…
Systematiq provides bid support to Daimler and Bus Australia Pacific(DTBAuP) for a large bus proposal for Transport for NSW (TfNSW). The Customer’s Challenge DTBAuP required bid support in the form…
Yarra Trams is currently undergoing preparation for ISO55001 Certification for their Asset Management System.
In order to better manage their assets the Centre of Engineering and Asset Management (CEAM) was formed and is undertaking reliability analysis of Rolling Stock and Life Cycle Cost modelling across the business to inform: budget requirements; Ensure service reliability; and achieve PTV contractual requirements.
Evolution Rail (A joint venture between Downer EDI Rail Pty Ltd (Downer) and Changchun Railway Vehicles – CRRC) is responsible for managing the engineering program for the High Capacity Metro Train (HCMT) program as a part of the Victorian Government’s investment in the Packenham Rail Electrification.
In order to establish the reliability parameters associated with the rolling stock, Downer engaged Systematiq Pty Ltd (Systematiq) to supplement their systems engineering team with particular reference to managing logistics support analysis, parts provisioning and reliability analysis activities
This year, Systematiq was invited to sponsor the end of year gathering for the Vitoria Barracks Chapter of the Victorian RAEME Association held at the Little Mule Café in Melbourne.
