Metro Trains Melbourne (MTM), as the Accredited Rail Transport Operator (ARTO) of the Melbourne Metropolitan Train Network (MMRN), plays an essential role in the acceptance of the new High Capacity…
Yarra Trams is currently undergoing preparation for ISO55001 Certification for their Asset Management System.
In order to better manage their assets the Centre of Engineering and Asset Management (CEAM) was formed and is undertaking reliability analysis of Rolling Stock and Life Cycle Cost modelling across the business to inform: budget requirements; Ensure service reliability; and achieve PTV contractual requirements.
Evolution Rail (A joint venture between Downer EDI Rail Pty Ltd (Downer) and Changchun Railway Vehicles – CRRC) is responsible for managing the engineering program for the High Capacity Metro Train (HCMT) program as a part of the Victorian Government’s investment in the Packenham Rail Electrification.
In order to establish the reliability parameters associated with the rolling stock, Downer engaged Systematiq Pty Ltd (Systematiq) to supplement their systems engineering team with particular reference to managing logistics support analysis, parts provisioning and reliability analysis activities
Systematiq was engaged by Downer EDI Rail to deliver systems engineering services in support of the High Capacity Metro Trains (HCMT) project including logistics support analysis, model developing and authoring related documents.
Metro Trains Melbourne engaged Systematiq to compile a System Safety Assurance Report. MTM sought project support and risk analysis services as part of the Southland Train Station development project.
Metro Trains Melbourne engaged Systematiq to manage Safety in Design Workshops and associated project support services to progress key rail projects throughout Melbourne.
